...
首页> 外文期刊>Zeitschrift fur Arznei- und Gewurzpflanzen >Assessment tool for Integrated Solid Waste Management Municipal Plans: part 1
【24h】

Assessment tool for Integrated Solid Waste Management Municipal Plans: part 1

机译:综合固体废物管理管理城市计划评估工具:第1部分

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Proper management of solid waste is a challenge for Brazilian municipalities. Considering the requirements of the National Solid Waste Policy (Politica Nacional de Residuos SOlidos - PNRS), an important step in this adaptation is the elaboration of the Municipal Plan of Integrated Solid Waste Management (Plano Municipal de Gestao Integrada de Residuos SOlidos - PMGIRS). Considering the importance of this planning instrument, this article proposes a tool for evaluating these plans. The methodological path of construction and validation was configured in three stages: conception of the indicators from bibliographic and documentary review; validation with experts, in which indicators were validated and weighting factors were defined using the Delphi technique; and application validation, which consisted of applying the tool to evaluate the PMGIRS of six Brazilian municipalities of different sizes. This article will present the results of the first and second stages. The results of the third stage will be presented in part 2 of this article. The tool allows to verify the fulfillment of PNRS requirements, the quality of the plans, the complexity of its elaboration, and its potential of implementation and continuity of the established actions. With this, it is expected to minimize the gap related to the monitoring of the various stages of PNRS implementation..
机译:适当管理固体废物是巴西市政府的挑战。考虑到国家固体废物政策的要求(POLITICA NACIALE DEINGUOS SOLIDOS - PNRS),这一适应的一个重要步骤是制定综合固体废物管理(Plano Municipal de Gestao Integleada De Residoos Solidos - PMGIR)的阐述。考虑到本计划文书的重要性,本文提出了一种评估这些计划的工具。建筑和验证的方法论路径在三个阶段进行了配置:参考书目和纪录片审查的指标的概念;验证专家的验证,其中指标被验证,使用Delphi技术定义了加权因素;和应用程序验证,包括应用工具,以评估六个巴西市各种不同大小的PMGIR。本文将介绍第一阶段的结果。第三阶段的结果将在本文的第2部分中提出。该工具允许核实PNR要求的履行,计划的质量,其阐述的复杂性及其实施和连续性的既定行动的潜力。有了这个,预计将最小化与监测PNR实施的各个阶段相关的差距。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号