首页> 外文期刊>platts Inside FERC's Gas Market Report >Mexican government works to ensure 240 MMcf/d of gas reaches Yucatan by mid-July
【24h】

Mexican government works to ensure 240 MMcf/d of gas reaches Yucatan by mid-July

机译:墨西哥政府致力于确保240 MMCF / D在7月中旬到达尤卡坦

获取原文
获取原文并翻译 | 示例
           

摘要

Mexico state-owned companies CFE, Pemex and CENAGAS are working together to ensure 240 MMcf/d of additional natural gas flows into the Yucatan Peninsula starting July 15, preventing further blackouts caused by gas shortages, the Mexican government said June 25. The additional 240 MMcf/d of gas supply is expected to arrive as a result of a reconfiguration of the Cempoala compressor station, the startup of TC Energy’s 2.6 Bcf/d Sur de Texas-Tuxpan pipeline and the completion of the Monte Grande interconnection, according to a statement from Yucatan Governor Mauricio Vila Dosal, CENAGAS Director Elvira Daniel and CFE Director Manuel Bartlett.
机译:墨西哥国有公司CFE,PEMEX和CENAGAS正在共同努力,以确保240 mmcf / d在7月15日开始,尤卡坦半岛流入尤卡坦半岛,防止墨西哥政府在6月25日表示,防止由天然气短缺引起的停电。额外的240 MMCF / D的气体供应是由于CEMPOALA压缩机站的重新配置,TC Energy的2.6 BCF / D Sur de Texas-Tuxpan管道的启动和Monte Grande互连的启动,以及蒙特Grande互连的结果 来自Yucatan Governor Mauricio Vila Danos,Cenagas Director Elvira Daniel和CFE总监Manuel Bartlett。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号