首页> 外文期刊>Natural Gas Week. >LNG Train Now in Service
【24h】

LNG Train Now in Service

机译:LNG火车现在在服务中

获取原文
获取原文并翻译 | 示例
           

摘要

Cameron LNG last week put Train 2 at its Hackberry,Louisiana,export project into commercial service.CEO Farhad Ahrabi said construction for Train 2 was completed last year,with the unit receiving gas flow for testing in November as it reached the final stage of the commissioning process.In December,Train 2 began producing LNG and shipping test cargoes.The federally approved project includes three liquefaction trains with a projected export capacity of more than 12 million tons/yr of LNG(4 million tons/yr per train),or about 1.7 Bcf/d(NGW Dec.9’19).Cameron LNG Train 3 is forecast to reach first LNG production in this year’s second quarter while Train 1 began commercial operations in August 2019.
机译:上周Cameron LNG将火车2位于克克斯兰,路易斯安那州,进出口项目进出口商业服务.Carhad Ahrabi表示,去年完成火车2的建筑,其中一个单位接受了11月的气流进行测试,因为它达到了最终阶段 调试过程。12月,火车2开始生产LNG和运输测试货物。联邦批准的项目包括三个液化列车,预计出口能力超过1200万吨/年的液化天然气(每列400万吨/年400万吨/年),或 大约1.7 BCF / D(NGW DEC.9'19).Cameron LNG火车3预计将在今年第二季度达到第一个液化天然气生产,而火车1在2019年8月开始商业运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号