...
首页> 外文期刊>Explosives Engineering >Further demolition at Ironbridge Power Station
【24h】

Further demolition at Ironbridge Power Station

机译:在铁桥电站进一步拆除

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Demolition Services undertook a successful demolition of the bunker bay at Ironbridge Power Station shortly after 1 lam on Friday 17th July 2020,working in partnership with SES Explosives Engineers.The company is headed up by CEO Jenna Romani-Arnold and despite fierce competition,a backlash of doubt and uncertainty from the industry,she has taken the company from strength to strength.The company's demolition portfolio to date is impressive,however works at the Ironbridge Power Station has put the company on a whole new level.The steel bunker bay structure was the first of three planned explosive events in order to bring down the former boiler house,with the turbine hall itself having been demolished using traditional high reach methods earlier this year.The company had already executed the explosive demolition of the four cooling towers on the same site in December 2019.
机译:拆迁服务在2020年7月17日星期五的1林经过1林之后成功地拆除了Ironbridge Power Station的Ironbridge Power Power Station,与SES爆炸物工程师合作。该公司由首席执行官Jenna Romani-Arnold领导,尽管竞争激烈,但反弹 她的疑问和不确定性来自该行业,她将公司从实力中取得了力量。该公司的拆迁组合迄今为止令人印象深刻,但在铁桥电站的工程已经将该公司放在全新的水平上。钢铁掩体湾结构 三项计划爆炸事件中的第一个是为了延续前锅炉房,涡轮大厅本身在今年早些时候使用传统的高达方法拆除。公司已经执行了四个冷却塔的爆炸性拆除 网站于2019年12月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号