Bloom Lake was purchased by Cliffs Natural Resources Limited (Cliffs) in 2011 for US$5.3b. Production instability andtailings management problems caused ramp up delays and FOB costs over US$90/t and the project failed to reachnameplate capacity of 8mtpa of high grade concentrate. Cliffs placed Bloom Lake in care and maintenance in2015.Champion Iron acquired the project out of creditor protection in 2015 with a cash payment plus assumption ofliabilities totaling US$39m.Champion spent US$244m to develop a new mine plan and revise the processing circuit toimprove recovery and increase production which commenced in Q2 2018. Champion predict production of 7.4mtpa and a64% reduction in cash cost compared to the previous operation. In an overheated asset market Cliffs paid too much forthe operation and were unable to control costs. With sunk development costs of US$3b this was a well-timed purchase ofa distressed asset in a rising market for high grade product.
机译:2011年由悬崖自然资源有限公司(Cliffs)购买了布鲁姆湖,持续5.3亿美元。 生产不稳定的管理问题导致斜坡延迟,福收费用超过90美元/吨,项目未能达到高档集中的8MTPA的容量。 悬崖放在2015年的盛开湖中.215.建立铁在2015年收购了债权保护的项目,现金支付加上债务总额为39米390万美元。244万美元开发新的矿山计划,并修改加工电路以便修改加工电路 2018年第2季度开始的恢复和增加产量。与之前的运营相比,冠军预测生产7.4MTPA的产量和现金成本减少了54%。 在过热的资产市场上,悬崖支付了太多的手术,无法控制成本。 沉没开发成本为3亿美元,这是一个在高档产品市场上涨市场中的令人痛苦的资产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号