...
首页> 外文期刊>The TEX Report >Long-term Production Plan at Moatize Coal Mine to Be Reviewed
【24h】

Long-term Production Plan at Moatize Coal Mine to Be Reviewed

机译:Moatize煤矿的长期生产计划进行审查

获取原文
获取原文并翻译 | 示例
           

摘要

As previously reported, Vale S.A., Brazil and Mitsui & Co., Ltd. have ended up totally reviewing the long-term production plan at Moatize open-cut coal mine, a metallurgical coal mine in Mozambique after re-examining the marketable coal reserves at this coal mine from now onward. The reason why Vale will review the long-term production plan at Moatize coal mine is because not only has the coal production at this coal mine decreased since entering 2019, but the production ratio of metallurgical coal also has dropped to a remarkable extent.
机译:正如以前报道的那样,Vale SA,巴西和三井&Co.,Ltd.已经完全审查了莫桑比克的冶金煤矿在莫桑比克冶金煤矿后审查了长期生产计划,重新审查了市场煤炭储备 这座煤矿从现在开始。 Vale将审查Moatize煤矿的长期生产计划的原因是因为由于进入2019年以来,这座煤矿的煤炭产量不仅减少,但冶金煤的生产比例也在显着程度上。

著录项

  • 来源
    《The TEX Report》 |2019年第12278期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号