...
首页> 外文期刊>The TEX Report >Metallurgical Coal Negotiations With Blast Furnaces Inevitably Protracted-Full stride negotiations difficult till solution on issue of pricing period
【24h】

Metallurgical Coal Negotiations With Blast Furnaces Inevitably Protracted-Full stride negotiations difficult till solution on issue of pricing period

机译:高炉冶金煤谈判不可避免地旷日持久-大步向前谈判很难解决定价期问题

获取原文
获取原文并翻译 | 示例

摘要

Metallurgical coal negotiations with Japanese blast furnace steel producers have become very likely to take a long time. As reported before, the largest metallurgical coal supplier BHP Billiton Mitsubishi Alliance (BMA) has sounded on possibility of retrenchment of pricing period of metallurgical coal and unless solution on this issue can be reached, it has become difficult to enter into full stride negotiations on metallurgical coal.
机译:与日本高炉钢铁生产商的冶金煤谈判很可能需要很长时间。正如之前报道的那样,最大的冶金煤供应商必和必拓三菱联盟(BMA)提出了削减冶金煤价格期限的可能性,除非能够解决该问题,否则就很难进入全面的冶金谈判了煤炭。

著录项

  • 来源
    《The TEX Report 》 |2010年第20期| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号