首页> 外文期刊>International Oil Daily >Bulgaria Again Delays Pipe OK
【24h】

Bulgaria Again Delays Pipe OK

机译:保加利亚再次推迟管道确定

获取原文
获取原文并翻译 | 示例
       

摘要

Bulgaria has again delayed a decision on going ahead with the 700,000 b/d Bourgas-Alexandroupolis oil pipeline, designed to bypass Turkey's congested Bosporus Strait. On his election in 2009, Bulgarian Prime Minister Boiko Borisov said Sofia would take another look at all energy projects with Russia, including BourgasAlexandroupolis, the South Stream gas pipeline and a nuclear power plant in Belene. The Bulgarian environment ministry said last week that a report into the environmental impact of building the 285-km Bourgas line needs more work and will take another two months to complete, but observers don't expect much progress even after that.
机译:保加利亚再次推迟了继续进行日产700,000桶Bourgas-Alexandroupolis输油管道的决定,该输油管道旨在绕过土耳其拥挤的博斯普鲁斯海峡。他在2009年的选举,保加利亚总理博伊科·鲍里索夫说,索菲亚会再看看与俄罗斯的所有能源项目,包括BourgasAlexandroupolis,南溪天然气管道和贝勒尼核电站。保加利亚环境部上周表示,关于建设285公里长的布尔加斯管线的环境影响的报告需要更多的工作,并且还需要两个月才能完成,但观察家并不希望取得更大的进展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号