首页> 外文期刊>Journal of the Mine Ventilation Society of South Africa >The conversation of No 1 S/V shaft at Kloof Gold Mine into an up-cast airway
【24h】

The conversation of No 1 S/V shaft at Kloof Gold Mine into an up-cast airway

机译:Kloof金矿的1号S / V井道向一条上倾气道过渡

获取原文
获取原文并翻译 | 示例
           

摘要

At the Kloof mine, the area served by the No.2sub-vertical shaft's infrastructure extends from 32 level(2555mbelow surface)to 39 level (3035m below surface). Projectionsmade in 1992 revealed that the area served by No.1 s/v shaftwould have been mined-out completely. The No.1 s/v shaft wasused traditionally as a parallel intake airway to No. 2 s/v shaft to32 level where the No.1 s/v shaft bottom is located. Theusefulness of this shaft infrastructure as an intake system islimited by the "bottleneck" affect on 32 level. An alternative wayof ventilating the proposed expansion had to be devised.
机译:在克卢夫(Kloof)矿,第二垂直井下基础设施服务的区域从32层(地下2555m)扩展到39层(地下3035m)。 1992年所作的预测表明,第1 s / v竖井所服务的区域已被完全挖空。 1号s / v轴传统上用作2号s / v轴至32号水平位置的平行进气道,1号s / v轴底部位于此位置。该竖井基础设施作为进气系统的用途受到32级“瓶颈”影响的限制。必须设计出另一种通风方式来提议的扩展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号