首页> 外文期刊>Journal of Performance of Constructed Facilities >Divergence or Congruence? A Path Model of Rework for Building and Civil Engineering Projects
【24h】

Divergence or Congruence? A Path Model of Rework for Building and Civil Engineering Projects

机译:发散还是同余?建筑和土木工程项目返工的路径模型

获取原文
获取原文并翻译 | 示例
           

摘要

Rework has been identified as a major contributor to cost and schedule overrun in construction projects. Previous studies that have examined rework are based on a limited data sets and thus eschew generalizations being made about the key determinants. Using data from 260 completed building (n=147) and civil engineering (n=113) projects, path analysis is used to develop a structural model of the most significant causes of rework. The model revealed that the paths of client-directed changes, site management and subcontractors, and project communication were statistically significant contributors to rework costs. The analysis confirmed that the lack of attention to quality management resulted in higher rework costs being incurred in the projects sampled. The analysis also revealed that there were no significant differences between building and civil engineering projects in terms of the direct and indirect cost of rework experienced, and the effectiveness of the project management practices implemented. Considering the findings, it is suggested that generic strategies for reducing the incidence rework in construction and civil engineering projects can be developed.
机译:返工被确定为建设项目成本和进度超支的主要因素。以前检查返工的研究都是基于有限的数据集,因此避免了对关键决定因素的概括。利用来自260个已完成的建筑(n = 147)和土木工程(n = 113)项目的数据,路径分析被用于开发返工最重要原因的结构模型。该模型显示,以客户为导向的变更,站点管理和分包商以及项目沟通的路径是返工成本的统计显着贡献者。分析确认,由于缺乏对质量管理的关注,导致抽样项目产生更高的返工成本。分析还显示,就所经历的直接和间接返工成本以及所实施的项目管理实践的有效性而言,建筑项目与土木工程项目之间没有显着差异。考虑到这些发现,建议可以制定减少建筑和土木工程项目中返工率的通用策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号