首页> 外文期刊>Journal of hydrology, New Zealand >Quantification and validation of a sediment budget for the lower Hutt River, Wellington, New Zealand
【24h】

Quantification and validation of a sediment budget for the lower Hutt River, Wellington, New Zealand

机译:新西兰惠灵顿赫特河下游的沉积物预算的量化和验证

获取原文
获取原文并翻译 | 示例
           

摘要

A sediment budget for the Hutt River was developed to assess the volume of sediment that needs to be removed to maintain hydraulic efficiency of the channel, and the potential environmental effects of sediment extraction along the river and at its mouth. The transport of both suspended sediment and bedload was calculated using the characteristics of the available sediment and flow records from Taita Gorge. There are no significant inputs of either sediment or water downstream of this location. The volume of suspended load was estimated using a sediment rating curve. Bedload transport was estimated using a range of theoretical equations relating sediment transport to flow and channel parameters, and the characteristics of the material forming the river bed and banks. The sediment transport models were validated using the cumulative change in sediment volume determined from repeated cross-section surveys, and the volume of sediment extracted from the river. Analysis of the sediment budget indicates that the average annual sediment transport, including suspended and bedload, downstream of Taita Gorge is approximately 104,000 m3/year. The calculated average sediment transport rate compares favourably to that derived from the analysis of channel cross-sections and sediment extraction records (approximately 88,000 m3/year). The difference is from material deposited downstream of the analysed cross-sections (and beyond the river mouth) which was not quantified, and also from errors in the cross-section data analysis and the records of sediment extraction volumes. Only 8% of the material transported downstream is bedload; the remaining 82% is suspended sediment. These estimates are consistent with other New Zealand data. The total volume of suspended sediment and bedload transported exceeds that removed for flood protection works, and extracted at the river mouth. The excess sediment con-tributes to aggradation of the river bed and harbour floor. Sediment transport varies considerably over time and is controlled largely by the number, magnitude, and duration of floods. The annual rate of sediment transport since 1987 has ranged from 75,000 to 139,000 m~3. Lower than average rates since 2004 reflect the lack of significant floods over this period. The calibrated sediment budget for the lower Hutt River is valuable for guiding river management and flood mitigation works, and assessing the potential environmentaleffects of human activities such as sediment extraction at the river mouth.
机译:制定了赫特河的泥沙预算,以评估为保持河道的水力效率而需要清除的泥沙量,以及沿河及其河口提取泥沙的潜在环境影响。悬浮沉积物和底泥的输送量是根据Taita峡谷现有沉积物和流量记录的特征计算得出的。该位置下游没有大量的沉积物或水输入。使用泥沙等级曲线估算悬吊物的体积。使用一系列理论方程式估算河床负荷,这些方程式将沉积物的运移与流量和河道参数以及形成河床和河岸的物质的特性联系起来。使用通过重复的断面调查确定的沉积物体积的累积变化以及从河流中提取的沉积物体积来验证沉积物传输模型。对沉积物预算的分析表明,Taita Gorge下游下游的年均沉积物运输量(包括悬浮物和床载量)约为104,000 m3 /年。计算得出的平均泥沙输送速率与通过对河道横截面和泥沙提取记录的分析得出的平均泥沙输送速率相比是有利的(约88,000立方米/年)。差异是由于未量化的分析断面下游(和河口以外)的沉积物,以及断面数据分析和沉积物提取量记录中的误差。下游运输的物料中只有8%是床载。剩余的82%是悬浮的泥沙。这些估计与其他新西兰数据一致。运输的悬浮沉积物和基床的总体积超过了防洪工程所去除的总体积,并在河口提取。过多的沉积物导致河床和海港底的沉积。沉积物的输送随时间变化很大,并且在很大程度上受洪水的数量,强度和持续时间的控制。自1987年以来,年输沙量在75,000至139,000 m〜3之间。自2004年以来低于平均水平,反映出这段时期内没有发生大水灾。校准后的赫特河下游泥沙预算对于指导河流管理和防洪工作以及评估人类活动(例如河口处的泥沙提取)的潜在环境影响非常有价值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号