Since 1993, Taggart Global has been engineering, designing and constructing coal preparation plants and material handling facilities around the world. Plant capacities range from 150 - 3000 tph and have historically been designed and built using a conventional approach. Conventional preparation plants are typically stick-built, meaning the structural steel for the plant is erected as a central grid with all equipment located within the bays. The outer area of the plant structure is usually enclosed with sheeting.
机译:自1993年以来,Taggart Global一直在全球范围内设计,设计和建设选煤厂和物料搬运设施。工厂的产能从150吨/小时至3000吨/小时不等,历史上是使用常规方法设计和建造的。常规的准备工厂通常采用棒式建造,这意味着工厂的结构钢被竖立为中央网格,所有设备均位于海湾中。植物结构的外部区域通常被薄片覆盖。