Reduce risk in commissioning

机译:降低调试风险

获取原文
获取原文并翻译 | 示例
           

摘要

There is hardly an area of the oil and gas production process that isn't identified with a risk of some sort: operational, regulatory, environmental, legal or financial. The months or years needed to move a hydrocarbon processing plant or an offshore production platform from sanction to production is one long line of risks. The costs of developing facilities, installing equipment and readying everything for operation range from tens to hundreds of millions of dollars, and costs are rising. Whether the money is spent for land-based processing facilities or deepwater production platforms, capital expenditures are estimated in the billions of dollars. Every company that overcomes the cost barriers and invests in production or processing plant facilities intellectually recognizes that minimizing its risks up front will pay off in getting its facilities online more quickly and safely. The challenge is how to deal with those risks.
机译:油气生产过程中几乎没有一个领域存在某种风险:运营,监管,环境,法律或财务风险。将碳氢化合物加工厂或海上生产平台从制裁转移到生产所需的几个月或几年的时间是一长串的风险。开发设施,安装设备和准备运行所需的一切费用从数千万美元到数亿美元不等,而且成本还在不断上升。无论这些钱是用于陆上加工设施还是深水生产平台,资本支出估计都在数十亿美元。克服成本障碍并投资于生产或加工厂设施的每家公司都明智地认识到,将风险最小化将在更快,更安全地使工厂联机方面有所回报。挑战在于如何应对这些风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号