Gold Coast Water is responsible for the management of the water, recycled water and wastewater assets of the City of the Gold Coast on Australia's east coast. Excess treated recycled water is released at the Gold Coast Seaway, a man-made channel connecting the Broadwater Estuary with the Pacific Ocean, on an outgoing tide in order for the recycled water to be dispersed before the tide changes and re-enters the Broadwater estuary. Rapid population growth has placed increasing demands on the city's recycled water release system and an investigation of the capacity of the Broadwater to assimilate a greater volume of recycled water over a longer release period was undertaken in 2007. As an outcome, Gold Coast Water was granted an extension of the existing release licence from 10.5 hours per day to 13.3 hours per day from the Coombabah wastewater treatment plant (WWTP). The Seaway Smart Release Project has been designed to optimise the release of the recycled water from the Coombabah WWTP in order to minimise the impact to the receiving estuarine water quality and maximise the cost efficiency of pumping. In order achieve this; an optimisation study that involves intensive hydrodynamic and water quality monitoring, numerical modelling and a web-based decision support system is underway. An intensive monitoring campaign provided information on water levels, currents, winds, waves, nutrients and bacterial levels within the Broadwater. This data was then used to calibrate and verify numerical models using the MIKE by DHI suite of software. The Decision Support System will then collect continually measured data such as water levels, interact with the WWTP SCADA system, run the numerical models and provide the optimal time window to release the required amount of recycled water from the WWTP within the licence specifications.
机译:黄金海岸水务负责管理澳大利亚东海岸的黄金海岸市的水,循环水和废水资产。经过处理的多余的循环水在流出的潮汐中释放,这是一条连接宽水河口和太平洋的人工通道黄金海岸海道,以便在潮汐变化之前分散回收水并重新进入宽水河口。 。人口的快速增长对城市的循环水排放系统提出了越来越高的要求,并且在2007年进行了对布洛德沃特河在较长排放时间内吸收更多量的循环水的能力的调查。结果,黄金海岸水被授予将Coombabah废水处理厂(WWTP)的现有发布许可从每天10.5小时延长到每天13.3小时。 Seaway的智能释放项目旨在优化Coombabah污水处理厂的循环水排放,以最大程度地减少对接收河口水质的影响,并最大程度地提高抽水的成本效率。为了做到这一点;目前正在进行一项优化研究,其中涉及深入的水动力和水质监测,数值建模以及基于网络的决策支持系统。一次密集的监测运动提供了有关Broadwater内水位,水流,风,波浪,养分和细菌水平的信息。然后,使用MIKE by DHI软件套件将此数据用于校准和验证数值模型。然后,决策支持系统将收集连续测量的数据(例如水位),与WWTP SCADA系统进行交互,运行数值模型并提供最佳时间窗口,以在许可规范内从WWTP释放所需量的再生水。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号