The progress of section 2: 2001

机译:第2节的进度:2001年

获取原文
获取原文并翻译 | 示例
           

摘要

THE contracts for the 38.5 km long Section 2 were let in January and February 2001, following the tender and assessment periods during 2000. The contractor joint ventures immediately moved into the CTRL office in Tottenham Court Road, in London, to work together with the RLE team in the detailed preliminary design, the planning and value engineering for up to six months before starting on site. This also led to co-operation between all contracts, the purchasing of system wide materials jointly, such as cast iron linings for the cross passages and openings in therunning tunnels and other tunnel materials. Following the signing of the contracts with the four tunnelling contractor joint ventures, negotiations were completed with the four TBM manufacturers for the delivery to site of the eight TBMs between April and August 2002 depending upon the individual contract.
机译:在2000年的招标和评估期之后,长达38.5公里的第二部分的合同于2001年1月和2001年2月签订。承包商的合资企业立即搬入伦敦托特纳姆法院路的CTRL办公室,与RLE合作团队在开始现场工作之前,进行了长达六个月的详细初步设计,规划和价值工程。这也导致了所有合同之间的合作,共同购买了全系统材料,例如用于穿越通道的铸铁衬里和行进隧道中的开口以及其他隧道材料。与四家隧道承包商合资企业签订合同之后,与四家隧道掘进机制造商完成了谈判,根据单个合同,在2002年4月至8月之间将八台隧道掘进机交付现场。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号