【24h】

As Built Is Not Enough

机译:由于建造不足

获取原文
获取原文并翻译 | 示例
       

摘要

Belgian TSO Elia selects ACCC conductors to double the load transfer capacity of a 150-kV line. The development of transmission systems is essentially linked to the economic development of regions, expanding electricity markets, and the need to provide and interconnect all forms of power generation. When seeking new rights-of-way, transmission system operators (TSOs), together with many other service organizations, often face increasing opposition due to environmental issues and the not-in-my-backyard syndrome. Therefore, innovative TSOs with considerable support from research organizations and manufacturers are using new technical solutions that minimize the environmental impact and remain compliant with national legislation and international design standards. When faced with this challenge, Elia, the Belgian TSO (which is also 100% owner and 60% operator of the German TSO 50Hertz Transmission), considered the use of established solutions such as increasing the line voltage, increasing the conductor cross-sectional area, real-time monitoring and using conductors with a higher conductivity. None of these solutions offered a satisfactory answer. To meet the growing demand for energy and guarantee network reliability, Elia had to search for a cutting-edge solution.
机译:比利时TSO Elia选择ACCC导体以使150 kV线路的负荷传递能力增加一倍。传输系统的发展基本上与地区经济发展,不断扩大的电力市场以及提供和互连所有形式的发电的需求有关。在寻求新的通行权时,传输系统运营商(TSO)与许多其他服务组织一起,由于环境问题和后院非综合症,常常面临越来越多的反对。因此,在研究组织和制造商的大力支持下,创新的TSO都在使用新的技术解决方案,以最大程度地减少对环境的影响并保持国家法规和国际设计标准的遵守。面对这一挑战,比利时TSO Elia(也是德国TSO 50Hertz传输的100%所有者和60%运营商)考虑采用既定解决方案,例如增加线路电压,增加导体截面积,实时监控并使用具有更高电导率的导体。这些解决方案均未提供令人满意的答案。为了满足不断增长的能源需求并确保网络可靠性,Elia必须寻求最先进的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号