...
首页> 外文期刊>Chemical Processing >Speed Up Cycle Time
【24h】

Speed Up Cycle Time

机译:加快周期时间

获取原文
获取原文并翻译 | 示例

摘要

FIX THE JACKET Increase the surface area for cooling by piping up cooling water to the reactor jacket. When you need to go from heating to cooling mode on the reactor, you will want to drain the condensate out of the jacket. So, install a drain valve and vent valve on the jacket. After the condensate is drained, shut the drain and vent valves and open the new cooling water supply and return valves to the reactor jacket. The additional surface area you get by using cooling water in the jacket is about 300 ft2, which should decrease your cooling time by 1 1/2 hours. After you finish cooling the reactor, you will want to drain the jacket so as not to contaminate the condensate return with cooling water. This doesn't significantly decrease your cooling time, but it helps.
机译:固定外套通过将冷却水管道输送到反应堆外套中来增加冷却表面积。当您需要从反应器的加热模式切换到冷却模式时,您需要将冷凝水从夹套中排出。因此,在外套上安装排水阀和排气阀。冷凝水排出后,关闭排水阀和排气阀,并打开新的冷却水供应和回流阀至反应器夹套。使用夹克中的冷却水可获得的额外表面积约为300平方英尺,这将使冷却时间减少1 1/2小时。在完成对反应器的冷却之后,您将需要排空夹套,以免被冷却水污染冷凝水回流。这不会显着减少冷却时间,但会有所帮助。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号