首页> 外文期刊>The Asia Miner >Eastern Dragon production to begin
【24h】

Eastern Dragon production to begin

机译:东方龙开始生产

获取原文
获取原文并翻译 | 示例
           

摘要

PRODUCTION is scheduled to begin this quarter at Eldorado Gold's Eastern Dragon Gold-Silver Project in northern China's Heilongjiang Province. It will be the company's fourth operating mine in China behind Tanjianshan, Jinfeng and White Mountain. Construction at the site has been in full swing throughout 2011. Eastern Dragon is about 45km south-east of the town of Xunke, which is adjacent to the Heilongjiang River that forms the border with Russia. The project site is on public land in lightly forested rolling hills with water nearby. Winters are severe, with the exploration field season restricted to April to October each year.
机译:生产定于本季度在中国北方黑龙江省的黄金国的东方龙金银项目开始。这将是该公司在中国的第四座矿山,仅次于潭尖山,金峰和白山。该场地的建设已在2011年进行得如火如荼。东方龙(Eastern Dragon)在迅克镇东南约45公里处,该镇毗邻与俄罗斯接壤的黑龙江河。该项目的场地位于森林茂密的连绵起伏的丘陵上的公共土地上,附近有水。冬季严峻,勘探季节仅限于每年的4月至10月。

著录项

  • 来源
    《The Asia Miner》 |2011年第6期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号