...
首页> 外文期刊>ZEVrail - Glasers Annalen >Test und Validierung der Sicherungs- und Betriebsleittechnik Transrapid
【24h】

Test und Validierung der Sicherungs- und Betriebsleittechnik Transrapid

机译:测试和验证Transrapid安全和操作控制系统

获取原文
获取原文并翻译 | 示例

摘要

The Operation Control System (OCS) is the central component of the Shanghai Transrapid. The OCS is the central control, monitoring and operation facility and has been developed by Siemens Transportation Systems (TS) in Brunswick. The OCS could be implemented in record time due to the many years of Transrapid experience and the competence in the field of signalling and operation control systems concentrated in Brunswick. Siemens TS met the challenge of refining the Transrapid system on the basis of the Transrapid Test Facility in the Emsland and obtaining product maturity until handover to the customer with their proven signalling and operation control system components and new software solutions. This article describes the steps Siemens Transportation Systems have taken to demonstrate that the OCS of the Shanghai Transrapid fully and correctly satisfies the requirements made. The article provides an overview of the OCS architecture followed by a description of the Test Centre and the individual phases of OCS testing and is closed with explanations on OCS validation and an outlook on the future.
机译:运营控制系统(OCS)是上海Transrapid的核心组件。 OCS是中央控制,监视和操作设备,由不伦瑞克省的西门子交通系统(TS)开发。由于多年的Transrapid经验以及集中在不伦瑞克(Brunswick)的信号和操作控制系统领域的能力,可以在创纪录的时间内实施OCS。西门子TS在Emsland的Transrapid测试设施的基础上,对Transrapid系统进行了完善,并获得了成熟的产品,直到他们将其成熟的信号和操作控制系统组件以及新的软件解决方案移交给客户为止,都面临着挑战。本文介绍了西门子交通运输系统采取的步骤,以证明上海轻快铁的OCS能够完全正确地满足要求。本文概述了OCS体系结构,随后介绍了测试中心和OCS测试的各个阶段,并在结尾处提供了有关OCS验证的解释和对未来的展望。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号