首页> 外文期刊>ZEVrail - Glasers Annalen >Planungen zur Grunderneuerung der denkmal- geschuetzten Bahnsteighalle im Hauptbahnhof Frankfurt am Main
【24h】

Planungen zur Grunderneuerung der denkmal- geschuetzten Bahnsteighalle im Hauptbahnhof Frankfurt am Main

机译:规划对美因河畔法兰克福主要车站的平台大厅进行全面翻新

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The following paper describes the planning concept of the renewal of the platform hall at Frankfurt's main station, which was built 1888 and extended in 1924. The platform hall is listed since 1972. Reasoned by extraordinary difficulties in maintenance and far too less renewal work in the last decades many damages at the lattice work girders and the roof occured. The renewal work must be done with respect while maintaining the usage of the station and under consideration of the conditions resulting from the protection of the historic building and the statical behaviour of the structure. Various circumstances, among others the logistics, which influence the planning and 1st results are discussed.
机译:以下文件描述了法兰克福总站平台大厅的翻新规划概念,该大厅始建于1888年,于1924年扩建。该平台大厅自1972年起就被列出。在过去的几十年中,格子工作梁和屋顶发生了许多损坏。翻新工作必须在尊重车站使用情况的前提下进行,并要考虑到对历史建筑的保护和结构的静力行为所产生的条件。讨论了影响规划和第一结果的各种情况,尤其是物流。

著录项

  • 来源
    《ZEVrail - Glasers Annalen》 |2004年第7期|p.232-234236-238|共6页
  • 作者

    Dietmar Ruecker;

  • 作者单位

    DB ProjektBau GmbH, Niederlas- sung Mitte, Hahnstrasse 52, 60329 Frankfurt, Deutschland;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 ger
  • 中图分类 铁路运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号