首页> 外文期刊>World tunnelling >Auger boring is right on track in Lithuania
【24h】

Auger boring is right on track in Lithuania

机译:在立陶宛,钻龙钻正步入正轨

获取原文
获取原文并翻译 | 示例
           

摘要

While the construction sector in Western Europe and the US has faced some tough times over the past few years, the industry has boomed in Eastern Europe. Companies such as UAB Grundolita in Lithuania have been kept on the go to fulfill demand for infrastructure projects. When Grundolita was hired to tackle its longest trenchless pipe-laying job yet - 42m beneath a major railroad - it had the capability to carry out the job, thanks to a new McLaughlin McL54/60 auger boring machine.
机译:尽管过去几年西欧和美国的建筑业面临着艰难的时期,但东欧的建筑业却蓬勃发展。立陶宛的UAB Grundolita等公司一直忙于满足基础设施项目的需求。当Grundolita被聘用来完成其迄今为止最长的非开挖管道铺设工作时(主要铁路下方42m),得益于新的McLaughlin McL54 / 60螺旋钻镗床,它才有能力执行这项工作。

著录项

  • 来源
    《World tunnelling》 |2009年第4期|2.122.14|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号