Du beton arme continu dans un tunnel a Liege en Belgique

机译:比利时列日隧道中的连续钢筋混凝土

获取原文
获取原文并翻译 | 示例
           

摘要

In June 2000, a new motorway link (E25-E40) was a inaugurated in Liege to solve transit and local traffic problems. It serves more than 65,000 vehicles a day in both directions. With multiple technical, environmental and security-related constraints, the 5 kilometres of this infrastructure prefigure numerous works such as bridges, roads, interchanges, etc. as well as 3 important tunnels of a combined length of 2.75 kilometres. For quality, durability and safety reasons, this infrastructure, and therefore the tunnels too, have been covered with a continuously reinforced concrete pavement. To take due account of the obvious size and accessibility constraints, both the building process and the composition of the concrete had to be fundamentally adapted and entailed numerous consequences : working in phases, using a mixer and transport tank, the workability of the concrete, iron framework, organization of works, surface treatment, etc. These constraints turned this covering project into a real challenge, one take up by all intervening parties to the great satisfaction of the many users.
机译:2000年6月,在列日启用了一条新的高速公路连接线(E25-E40),以解决运输和当地交通问题。它每天双向服务超过65,000辆汽车。受到多种技术,环境和安全相关的限制,该基础设施的5公里预示了许多工程,例如桥梁,道路,立交桥等,以及3条重要隧道,总长为2.75公里。出于质量,耐用性和安全性的考虑,该基础设施以及隧道也都覆盖有连续加固的混凝土路面。要充分考虑明显的尺寸和可及性限制,必须从根本上调整建筑过程和混凝土成分,并带来许多后果:分阶段工作,使用搅拌机和运输罐,混凝土的可加工性,铁这些限制使这一覆盖项目变成了一项真正的挑战,所有参与方都对此表示了极大的满意。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号