...
首页> 外文期刊>Travaux >Evolution des techniques de monitoring temps reel sur les chantiers de percement de tunnels urbains
【24h】

Evolution des techniques de monitoring temps reel sur les chantiers de percement de tunnels urbains

机译:城市隧道钻井现场实时监控技术的发展

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The rapid development of real-time soil and structure instrumentation techniques makes it possible to put in place rapid feedback loops when digging new urban tunnels. These feedback loops include the monitoring system, and they may involve retrospective validation of the calculation assumptions, additional calculations, a change in tunnel construction methods, preventive consolidation work, or compensation grouting. This article describes various technological stages covered over the past ten years on major urban tunnel drilling projects (Amsterdam, London, Puerto Rico, Madrid, Hong Kong, Toulon).
机译:实时土壤和结构仪器技术的快速发展使得在挖掘新的城市隧道时可以建立快速反馈回路。这些反馈回路包括监测系统,并且可能涉及对计算假设的回顾性验证,其他计算,隧道施工方法的变更,预防性加固工作或补偿灌浆。本文介绍了过去十年中主要城市隧道钻探项目(阿姆斯特丹,伦敦,波多黎各,马德里,香港,土伦)所涵盖的各个技术阶段。

著录项

  • 来源
    《Travaux》 |2004年第805期|p.70-73|共4页
  • 作者

    E. Gastine;

  • 作者单位

    SolData;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 fre
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号