Patience is a necessary virtue for many wind developers in Europe, judging by a study of obstacles to wind development in the region. The EU-funded Wind Barriers project finds it is quicker to get consent for an offshore wind project, with an average lead time of 18 months, compared to 42 months for onshore. The time needed for wind farm construction permission applications ranges across the EU from less than ten months to nearly 60. The project was co-ordinated by the European Wind Energy Association (EWEA). It collected data from 22 countries representing 5.7GW of capacity, most of it connected in 2008. The initial results were revealed at the European Wind Energy Conference in Warsaw, Poland, in April.
机译:通过研究对该地区风电发展的障碍进行判断,耐心是欧洲许多风电开发商必不可少的美德。欧盟资助的“风障项目”发现,离岸风能项目获得许可的速度更快,平均交货时间为18个月,而陆上风电项目为42个月。整个欧洲范围内的风电场建设许可申请所需的时间从不到十个月到近六十个月不等。该项目由欧洲风能协会(EWEA)协调。它收集了来自代表5.7GW容量的22个国家/地区的数据,其中大多数数据在2008年接通。4月在波兰华沙举行的欧洲风能大会上公布了初步结果。

著录项

  • 来源
    《Windpower monthly》 |2010年第6期|p.55|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号