...
首页> 外文期刊>Windpower monthly >Vestas to sell off factories
【24h】

Vestas to sell off factories

机译:维斯塔斯出售工厂

获取原文
获取原文并翻译 | 示例
           

摘要

Over the last year Vestas has been engaged in a substantial restructuring programme to cut costs and overcapacity. The staffing figures tell how far this has come. In 2010, Vestas employed around 25,000 people around the globe. Last year, chief executive Ditlev Engel said he wanted to shave this figure to around 16,000. It could come down even more. In what is described as building "flexibility" into the manufacturing process, Vestas has signalled it is looking to offload some of its factories involved in machining or producing raw materials. However, included in this list is the company's only tower factory in Pueblo, in the US state of Colorado, which recently won a multimillion-dollar supply deal from an unnamed third-party manufacturer. Speaking to Windpower Monthly, the man handling the programme, Vestas chief operating officer Jean-Marc Lechene, referred to last year's sale of its tower factory in Varde, Denmark, to Chinese firm Titan Energy as a template for future deals. As part of the deal, Vestas agreed to continue sourcing from the plant.
机译:去年,维斯塔斯一直在进行一项重大的重组计划,以削减成本和产能过剩。人员配备数字说明了这一过程的进展。 2010年,维斯塔斯在全球拥有约25,000名员工。去年,首席执行官Ditlev Engel表示,他希望将这一数字降至16,000。它可能会下降更多。维斯塔斯表示在制造过程中建立“灵活性”,这标志着维斯塔斯正在寻求卸载其一些涉及机械加工或生产原材料的工厂。但是,该清单中包括该公司在美国科罗拉多州普韦布洛唯一的塔式工厂,该工厂最近赢得了一家未具名的第三方制造商的数百万美元的供应合同。维斯塔斯首席运营官让·马克·莱切内(Jean-Marc Lechene)在接受《风能月报》采访时说,他提到去年将其在丹麦瓦德的塔式工厂出售给中国公司泰坦能源,作为未来交易的模板。作为交易的一部分,维斯塔斯同意继续从该工厂采购。

著录项

  • 来源
    《Windpower monthly》 |2013年第4期|1517|共2页
  • 作者

    James Qailter;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号