首页> 外文期刊>WET News >How to clear 50,000 cubic metres of sludge in six months
【24h】

How to clear 50,000 cubic metres of sludge in six months

机译:如何在六个月内清除50,000立方米的污泥

获取原文
获取原文并翻译 | 示例
       

摘要

Two Aldec G2 decanter centrifuges from Alfa A Laval have helped Yorkshire Water avoid a potential environmental problem at its Esholt Sewage Treatment Works by clearing a backlog of 50,000 cubic metres of sludge in just six months. Covering no less than 340 acres and serving the Bradford area, Yorkshire Water's Esholt Sewage Treatment Works is the largest filter site of its kind in Europe. Its complex of mineral filters handles the sewage generated by a total equivalent population of 600,000 in West Yorkshire and produces a humus sludge that is treated, dewatered and then mixed with wood waste to produce a rich conditioned sludge which is then used for either agriculture or land remediation.
机译:两台来自Alfa A Laval的Aldec G2倾析器离心机通过在短短六个月内清除了积压的50,000立方米污泥,帮助约克郡水务公司在其Esholt污水处理厂避免了潜在的环境问题。 Yorkshire Water的Esholt污水处理厂占地340英亩以上,服务于Bradford地区,是欧洲同类过滤器中最大的过滤厂。它的矿物过滤器综合设施可处理西约克郡60万总人口产生的污水,并产生腐殖质污泥,经过处理,脱水后再与木屑混合,产生出丰富的条件污泥,然后将其用于农业或土地补救措施。

著录项

  • 来源
    《WET News》 |2005年第8期|p.11-12|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 水利工程;
  • 关键词

  • 入库时间 2022-08-18 00:22:41

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号