首页> 外文期刊>WET News >Imtech Bids In The Big Time
【24h】

Imtech Bids In The Big Time

机译:Imtech竞标

获取原文
获取原文并翻译 | 示例
       

摘要

"We've come a long way in three years," says Duncan Wild-goose, business development manager at Imtech Process. What he is referring to is the fact that the company is now firmly on the map when it comes to tendering for large contracts in the water industry. This is borne out by two projects the company is currently bidding for. One of these projects concerns Thames Water's Tideway Tunnel scheme, which, during heavy rainfall, will capture wastewater flows and transfer if to a wastewater treatment works (WwTW) for full treatment. Imtech Process is one of two companies bidding for the £180M upgrade to Crossness WwTW that is included in the Tideway project.
机译:Imtech Process业务开发经理Duncan Wild-goose说:“三年来我们已经走了很长一段路。”他指的是这样的事实:在水务行业的大型合同招标中,该公司现在处于稳固的位置。目前该公司正在竞标的两个项目证明了这一点。这些项目之一涉及泰晤士水务(Thames Water)的潮道隧道计划,该计划在暴雨期间将捕获废水流,并转移到废水处理厂(WwTW)进行全面处理。 Imtech Process是两家竞标Tideway项目中的£180M升级Crossness WwTW的公司之一。

著录项

  • 来源
    《WET News》 |2008年第8期|p.8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 水利工程;
  • 关键词

  • 入库时间 2022-08-18 00:22:03

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号