首页> 外文期刊>WET News >Water under the bridge
【24h】

Water under the bridge

机译:桥下的水

获取原文
获取原文并翻译 | 示例
       

摘要

Underground Moling Services has completed a complex operation Involving the rerouting of a water main and power cables during the renovation of a 100-year-old bridge. Space was tight, and time even tighter. AS PART of the national drive towards reducing road congestion and carbon emissions from road traffic, the multimillion-pound Central Scotland Rail/Road Freight Interchange facility has been built at Grangemouth, Stirlingshire. This is intended to take freight traffic off the roads and place it on to the rail network. But there is still significant heavy goods traffic associated with the interchange facility -freight is brought to the site to be placed on to the rail system.
机译:地下Mo陵服务公司已完成一项复杂的操作,其中涉及在对一座已有100年历史的桥梁进行翻新期间重新铺设水管和电力电缆。空间狭窄,时间更紧。作为减少道路拥堵和道路交通碳排放的全国性举措的一部分,已在斯特灵郡的格兰奇茅斯建造了耗资数百万英镑的苏格兰中部铁路/公路货运交汇处设施。目的是将货运从道路上带走,然后将其放置在铁路网络上。但是,仍然存在大量与换乘设施相关的重型货物运输-货物被运送到现场并放置在铁路系统上。

著录项

  • 来源
    《WET News》 |2008年第4期|p.11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 水利工程;
  • 关键词

  • 入库时间 2022-08-18 00:22:06

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号