首页> 外文期刊>WET News >Tunnel route unveiled
【24h】

Tunnel route unveiled

机译:隧道路线揭幕

获取原文
获取原文并翻译 | 示例
       

摘要

Thames Water has gone out to consultation over its plans for a tunnel to reduce the amount of raw sewage discharged into the River Thames. The proposal has already received government backing.rnThe consultation takes into account the route of the tunnel and the sites needed to construct and operate the project. The tunnel will run up to 20 miles from its starting point in west London, following the route of the River Thames to the east of Tower Bridge before going one of three ways:rn1. North-east to connect to the Lee Tunnel at Abbey Mills in Stratfordrn2. East following the river and crossing the Greenwich peninsular up to Beckton Sewage Treatment Works.
机译:泰晤士水务公司已开始就其隧道计划进行协商,以减少排入泰晤士河的原污水量。该建议已得到政府的支持。咨询工作考虑了隧道的路线以及建设和运营该项目所需的场地。隧道将从伦敦西部的起点开始长达20英里,沿着泰晤士河到塔桥东的路线,然后通过以下三种方式之一进行:rn1。东北连接到斯特拉特福德市Abbey Mills的Lee隧道。向东,沿河而过,穿过格林威治半岛,直至贝克顿污水处理厂。

著录项

  • 来源
    《WET News》 |2010年第10期|p.2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:21:29

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号