首页> 外文期刊>WET News >Aarsleff uses CIPP to lay 2.8km of sewers in 22 days
【24h】

Aarsleff uses CIPP to lay 2.8km of sewers in 22 days

机译:Aarsleff使用CIPP在22天之内铺设了2.8公里的下水道

获取原文
获取原文并翻译 | 示例
       

摘要

Aarsleff UK'S specialist insitu pipe relining Pipe Technologies division has completed the relining of 2.8km of foul sewers in only 22 days, as part of Anglian Water's Basildon and Billericay Sewer Rehabilitation scheme in Essex. The different lengths of sewers, in various diameters at nearly 50 different locations, were quickly renewed with Aarsleff's CIPP cured in place resin impregnated polyester felt liners, forming joint free, leak proof smooth bore pipes within a pipe. One of Aarsleff's installation teams came over from Denmark for the Basildon project to beat by nearly 40% the client's production target requirement of two liners a day. They averaged 2.75 liners. The required 46 liners, ranged in diameter from 150mm to 450mm and lengths from 15m up to 136m.
机译:英国Aarsleff的专业管道内衬改建工程管道技术部门仅22天就完成了2.8公里的污水管的改建工作,这是Anglian Water的Essex的Basildon和Billericay下水道修复工程的一部分。通过Aarsleff的CIPP固化在位的树脂浸渍聚酯毡衬板,迅速更新了不同长度,直径近50个不同位置的下水道,从而在管子内形成了无接头,防漏的光滑孔管。 Aarsleff的一个安装团队从丹麦赶来执行Basildon项目,以超过客户每天生产两支班轮的生产目标要求近40%。他们平均得到2.75班轮。所需的46个衬管,直径从150mm到450mm,长度从15m到136m不等。

著录项

  • 来源
    《WET News》 |2011年第8期|p.14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:21:13

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号