首页> 外文期刊>WET News >Big Brute keeps drainage cleaning on track
【24h】

Big Brute keeps drainage cleaning on track

机译:Big Brute使排水清洁保持正常

获取原文
获取原文并翻译 | 示例
       

摘要

Lanes Group has been trialling a vacuumation system on the London Underground to solve 'one of the most notorious' drainage maintenance problems on the Tube network. Working in partnership with the London Underground, Lanes has tested the Big Brute technology on the Metropolitan Line north of Baker Street, which has one of the most challenging track drainage systems on the Underground. The new cleaning technique is expected to improve safety, reduce waste sent to landfill, improve operational outputs, and contribute significantly to service reliability, reducing the risk of costly service failure penalties. Dubbed Big Brute, the machine is being tested on a four mile section of the Metropolitan Line between Baker Street and Finchley Road, known as M100. Not only is this stretch one of the oldest sections of the London Underground system, it is one of the busiest sections of the Tube.
机译:莱恩斯集团一直在伦敦地铁上试用真空系统,以解决地铁网络中“最臭名昭著”的排水维护问题。 Lanes与伦敦地铁合作,在贝克街以北的大都会线上测试了Big Brute技术,该技术是地下最具挑战性的轨道排水系统之一。新的清洁技术有望提高安全性,减少送入垃圾填埋场的废物,提高运营产出并显着提高服务可靠性,从而降低因维修失败而遭受高额罚款的风险。这款名为Big Brute的机器正在贝克街和芬奇利路之间的都会线四英里路段(称为M100)进行测试。这条路不仅是伦敦地铁系统最古老的部分之一,还是地铁最繁忙的部分之一。

著录项

  • 来源
    《WET News》 |2015年第6期|8-8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:19:22

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号