Using the example of two representative types of unalloyed and low-alloy grades of cast steel, the paper discusses whether in production welding the customary three-stage procedure of the technical standard can be reduced to a two-stage procedure. It is shown that in the case of GS-C 25 the initial normalizing or quenching and tempering treatment usually applied is not necessary, instead it is possible to weld with appropriate quality in the as-cast condition. Only afterwards is normalizing or quenching and tempering necessary. Stress relieving can also be dispensed with. With GS-17 CrMoV 5 11 also a reduction in the number of process stages is possible in principle, but because of the high hardness of the as-cast condition it is technologically more difficult to control.
机译:本文以两种典型的非合金和低合金等级铸钢为例,讨论了在生产焊接中,技术标准的常规三阶段程序是否可以简化为两阶段程序。结果表明,在GS-C 25的情况下,通常不需要进行初始的正火或淬火和回火处理,而是可以在铸态条件下以适当的质量进行焊接。仅在此之后才需要进行正火或淬火和回火。也可以省去压力。使用GS-17 CrMoV 5 11原则上也可以减少工艺阶段的数量,但是由于铸态条件的硬度很高,因此在技术上更难控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号