首页> 外文期刊>Welding Journal >Fabricating an Offshore Cantilevered Deck Structure
【24h】

Fabricating an Offshore Cantilevered Deck Structure

机译:制造海上悬臂甲板结构

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Establishing the work scope, identifying the most effective way of installing the fabricated structures, and planning are the essential elements for achieving a successful project. Welders working on offshore installations must meet higher standards, as weld repairs slow down the project. Another essential element in the success of the project was the use of dimensional control. By applying dimensional control to all fabricated structures, the installation offshore was effected with no major fitup problems. The use of bolted hookup connections allowed the installation of the cantilevered deck structure to be performed during winter weather conditions, which would have prevented welding owing to the difficulties in constructing habitats around the hookup joints under adverse conditions.
机译:建立工作范围,确定安装预制结构的最有效方法以及计划是实现成功项目的基本要素。海上维修的焊工必须满足更高的标准,因为维修焊缝会拖慢工程进度。该项目成功的另一个基本要素是使用尺寸控制。通过对所有预制结构进行尺寸控制,可以在海上进行安装,而不会出现重大装配问题。使用螺栓连接连接允许在冬季天气条件下安装悬臂甲板结构,由于在不利条件下难以在连接关节周围建造栖息地,因此可以防止焊接。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号