...
首页> 外文期刊>Waterworld >A Tank in a Tank at Norwest Water Reclamation Plant
【24h】

A Tank in a Tank at Norwest Water Reclamation Plant

机译:Norwest水回收厂的水箱中的水箱

获取原文
获取原文并翻译 | 示例

摘要

In 2012, based on completed master plan and feasibility studies, the City of Lubbock, Texas, and its consulting engineer, Alan Plummer Associates Inc., identified the need to address rapid growth in the northwest quadrant of the city, given that the city's main wastewater treatment facility was located at its southeast plant across town. The existing interceptor from the northwest part of the city was no longer large enough to handle peak flows, so reducing current and future interceptor loading was critical for preparing for future growth.
机译:在2012年,根据完整的总体规划和可行性研究,得克萨斯州拉伯克市及其顾问工程师Alan Plummer Associates Inc.确定了应对该市西北象限快速增长的需求,因为该市主要废水处理设施位于城镇各处的东南工厂。来自城市西北部的现有拦截器不再足够应付高峰流量,因此减少当前和将来的拦截器负载对于为将来的增长做准备至关重要。

著录项

  • 来源
    《Waterworld 》 |2017年第9期| 54-54| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号