...
首页> 外文期刊>Waterways world >MIKRON 'BOATATHON' COMPLETED WELL UNDER TIME
【24h】

MIKRON 'BOATATHON' COMPLETED WELL UNDER TIME

机译:米克朗(MIKRON)'BOATATHON'顺利完工

获取原文
获取原文并翻译 | 示例
           

摘要

After winding up their annual summer tour at Gnosall on the Shropshire Union Canal in early September, a six-strong team from the Mikron Theatre group attempted a nonstop 'fly-boating' sponsored challenge of returning to their winter base at Worsley on the Bridgewater Canal in 40 hours. In fact they accomplished the 81-mile trip in 35 hours 15 minutes, including 36 locks - a total of 117 lock-miles. They set off from Gnosall at 6am on Monday 10th September and reached Worsley at 7.30pm the following day, raising over £1,000 for Mikron's future funding in the process.
机译:在9月初结束了在什罗普郡联合运河上格诺索尔的年度夏季巡回演出后,米克朗剧院小组的一支由6人组成的团队尝试了一次不间断的“飞艇”赞助挑战,重返他们在布里奇沃特运河的沃斯利冬季基地在40小时内。实际上,他们在35小时15分钟内完成了81英里的行程,包括36次锁-总共117锁英里。他们于9月10日星期一早上6点从Gnosall出发,并于第二天下午7.30到达Worsley,为Mikron在此过程中的未来资金筹集了1000多英镑。

著录项

  • 来源
    《Waterways world》 |2012年第11期|p.39|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号