首页> 外文期刊>Waterways world >Close shave at Stanley Docks
【24h】

Close shave at Stanley Docks

机译:在史丹利码头上剃光

获取原文
获取原文并翻译 | 示例
           

摘要

An emergency stoppage was called on the Liverpool Link at Stanley Docks on 10th April, when a building contractor was found to be working precariously on rubble over the Great Howard Street Bridge. Photographs released with the stoppage notice by CRT provoked astonishment from the Chester & Merseyside branch of the IWA. Their representative, Mike Carter, called on CRT to report the contractor to the Health & Safety Executive. "The photos supplied show clearly that the way the works have been carried out present a threat to life for both boaters and the men working on site," he told WW. "The contractor responsible must be held directly responsible and compensation sought."
机译:4月10日,斯坦利码头的利物浦链接被迫紧急停车,当时一名建筑承包商被发现在大霍华德街大桥上的瓦砾中摇摇欲坠。 CRT发出停工通知后发布的照片​​令IWA切斯特和默西塞德郡分公司感到惊讶。他们的代表Mike Carter呼吁CRT向健康与安全主管报告承包商。他告诉WW:“提供的照片清楚地表明,工作的进行方式对船员和现场工作人员的生命都构成了威胁。” “负责的承包商必须直接承担责任,并要求赔偿。”

著录项

  • 来源
    《Waterways world》 |2014年第6期|30-30|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号