首页> 外文期刊>Water >ALTERNATIVE WATER SOURCES: THE PIMPAMA-COOMERA SCHEME
【24h】

ALTERNATIVE WATER SOURCES: THE PIMPAMA-COOMERA SCHEME

机译:替代水源:PIMPAMA-COOMERA方案

获取原文
获取原文并翻译 | 示例
           

摘要

In his oral presentation Shaun Cox discussed aspects of the Gold Coast's plans not covered in the written paper. Bob Swinton reports them here as an addition to this important paper. He said "The driver for our development of alternative water sources is twofold, firstly a lack of water and secondly keeping effluent out of our waterways. We are also aiming to reduce the amount of stormwater and associated nutrient runoff from new developments. We have to find alternative means of managing our water resources in light of the considerable population growth we face. "The yields of our current dams are diminishing (from a maximum of 440 ML/d before the drought to our current yield of only 190 ML/d. but we will not be able to develop more dams. Yet we are asked to provide higher levels of service because our community is not responding to restrictions. It seems that we will need some 465 ML/d. Even with an intensive water use efficiency and leakage reduction campaign and possible seawater desalination, we will still be short of water. On the other hand, volumes of effluent will grow and stormwater run-off will increase as more and more impermeable surfaces are constructed. "The MasterPlan adopted by the Gold Coast Council schedules a number of greenfield developments, the first being the Pimpama Coomera region. Our Waterfuture Masterplan for this development, described in the paper, has been adopted by Council. Happily we have less institutional barriers than other organisations because the Gold Coast Council controls all services, including water supply, stormwater and wastewater. However, we can foresee some problems.
机译:肖恩·考克斯(Shaun Cox)在他的口头报告中讨论了书面文件中未涵盖的黄金海岸计划的各个方面。鲍勃·斯温顿(Bob Swinton)在此报告了他们,作为对这一重要论文的补充。他说:“推动我们开发替代水源的因素有两个,首先是缺水,其次是将水排入我们的水道。我们还致力于减少新开发项目的雨水量和相关的养分径流。我们必须鉴于我们面临的大量人口增长,找到其他管理水资源的方法。“我们目前的水坝产量正在减少(从干旱前的最高440毫升/天,到目前的仅190毫升/天。但是我们将无法开发更多的水坝,但由于我们的社区没有对限制做出回应,因此我们被要求提供更高水平的服务。似乎我们需要约465 ML / d的水,即使集水利用效率高,减少渗漏运动和可能的海水淡化,我们仍然缺水;另一方面,随着越来越多的不透水表面的建造,污水量将增加,雨水径流将增加ed。 “黄金海岸委员会通过的总体规划安排了一些新开发项目,其中第一个是Pimpama Coomera地区。本文所述的我们针对该开发的Waterfuture总体规划已由理事会通过。很高兴,我们的机构壁垒比其他项目少因为黄金海岸委员会控制着所有服务,包括供水,雨水和废水,但是我们可以预见到一些问题。

著录项

  • 来源
    《Water》 |2004年第3期|p.43-45|共3页
  • 作者

    S Cox;

  • 作者单位

    Gold Coast Water;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 市政工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号