首页> 外文期刊>Water >Fist Stage of Sembcorp Changi NEWater Plant Completed
【24h】

Fist Stage of Sembcorp Changi NEWater Plant Completed

机译:胜科樟宜NE水厂一期工程竣工

获取原文
获取原文并翻译 | 示例
           

摘要

The first phase of the Sembcorp Changi NEWater Plant (SCNP) in Singapore was completed on schedule and has began commercial operations. The plant uses the main advanced water treatment process steps of micro-filtration (MF), reverse osmosis (RO) and ultraviolet radiation to produce NEWater, high-grade reclaimed water. This ultra-clean water is mainly supplied to industrial and commercial customers including water fabrication plants. When completed in 2010, the plant will supply 15 per cent of Singapore's current water needs.
机译:新加坡胜科樟宜NE水厂(SCNP)的第一阶段如期完成,并已开始商业运营。该工厂使用微滤(MF),反渗透(RO)和紫外线辐射等主要的先进水处理工艺步骤来生产NEWater(高级再生水)。这种超净水主要提供给包括水处理厂在内的工业和商业客户。该工厂将于2010年竣工,将满足新加坡目前用水需求的15%。

著录项

  • 来源
    《Water》 |2009年第5期|18|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号