首页> 外文期刊>Water >PLANS FOR A NEW WASTE-TO-ENERGY FACILITY IN MELBOURNE'S NORTH
【24h】

PLANS FOR A NEW WASTE-TO-ENERGY FACILITY IN MELBOURNE'S NORTH

机译:在墨尔本北部建立新的垃圾发电设施的计划

获取原文
获取原文并翻译 | 示例
       

摘要

Yarra Valley Water is developing a waste-to-energy facility in the northern suburbs of Melbourne, which will convert organic waste destined for landfills into energy - reducing energy costs, waste to landfill and greenhouse gas emissions. The project is part of the utility's approach to operating its facilities within the carrying capacity of nature, with the aim of delivering better outcomes for the environment and customers. Yarra Valley Water has selected Aquatec-Maxcon, an Australian company specialising in industrial wastewater treatment, as its partner to develop the facility.
机译:亚拉河谷水务公司正在墨尔本北郊开发废物转化为能源的设施,该设施将把原本用于填埋的有机废物转化为能源,从而降低了能源成本,减少了垃圾填埋和温室气体的排放。该项目是公用事业公司在自然承载力范围内运营其设施的方法的一部分,目的是为环境和客户带来更好的结果。亚拉河谷水公司选择了一家致力于工业废水处理的澳大利亚公司Aquatec-Maxcon作为其合作伙伴来开发该设施。

著录项

  • 来源
    《Water》 |2013年第5期|1820|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:28:55

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号