...
首页> 外文期刊>Water21 >Buckman Direct Diversion Project diverts Rio Grande water forthe first time
【24h】

Buckman Direct Diversion Project diverts Rio Grande water forthe first time

机译:巴克曼直接引水工程首次引渡了格兰德河水

获取原文
获取原文并翻译 | 示例

摘要

1.CH2M HILL, with its joint venture partner Western Summit Constructors, have been the design-build team for the Buckman Direct Diversion Project (BDD), Santa Fe, New Mexico, USA, since March 2008. On 30 September, water was diverted for the first time from the Rio Grande and pumped 11 miles (17.6km) and 1100 vertical feet (330m) up to the Buckman Regional Water Treatment Plant (BRWTP). Rebecca Wurzburger, Chair of the BDD Project Board, said: 'This is truly a historic event on our journey to provide the Santa Fe region with a sustainable source of water. In a few short months, we will begin delivering quality drinking water to over 100,000 city and county water customers.'
机译:1.CH2M HILL及其合资伙伴Western Summit Constructors自2008年3月以来一直是美国新墨西哥州圣达菲的巴克曼直接改道项目(BDD)的设计建造团队。9月30日,水被分流了首次从里奥格兰德(Rio Grande)抽水11英里(17.6 km)和1100垂直英尺(330m)到达巴克曼地区水处理厂(BRWTP)。 BDD项目委员会主席丽贝卡·维尔茨堡(Rebecca Wurzburger)表示:“这确实是我们为圣达菲地区提供可持续水源的旅程中的历史性事件。在短短的几个月内,我们将开始为100,000多个城市和县的水用户提供优质的饮用水。”

著录项

  • 来源
    《Water21 》 |2010年第12期| p.51| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号