...
首页> 外文期刊>Water21 >Plant collaboration for efficient sewage treatment: exploring the potential for integrated wastewater management
【24h】

Plant collaboration for efficient sewage treatment: exploring the potential for integrated wastewater management

机译:工厂合作以实现高效污水处理:探索污水综合管理的潜力

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Any forecast is difficult, but investments in infrastructure must be designed for the long term. Predicting dramatic changes, especially those following the global credit crunch and the European Union / US public debt crisis, it is quite clear that nobody can perfectly plan the design and capacity of sewage treatment plants (STPs), i.e. to have the exact size and technology required to meet needs one or two decades after the design is completed. In other words, most STPs are either too large or too small, or have technologies not matching the actual needs.
机译:任何预测都是困难的,但是必须对基础设施进行长期设计。预测巨大变化,尤其是在全球信贷紧缩和欧盟/美国公共债务危机之后的变化,很显然,没有人能够完美规划污水处理厂(STP)的设计和产能,即拥有准确的规模和技术设计完成后一到二十年需要满足的需求。换句话说,大多数STP太大或太小,或者技术不符合实际需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号