首页> 外文期刊>Water & wastewater international >Common-wall design saved 30% to 40% in construction costs
【24h】

Common-wall design saved 30% to 40% in construction costs

机译:普通墙设计节省了30%到40%的建筑成本

获取原文
获取原文并翻译 | 示例
           

摘要

The Claiborne County Utility District in Tazewell, Tennessee, USA, saved up to US$ 2.7 million when building its new wastewater treatment facility. Long-term savings in future expansion costs, necessary process piping and energy costs will further increase possible savings. One year ago in February 2004, the Utility District went online with its new Hexa-Ditch treatment plant. The patented plants use a common-wall design, which allows for a less expensive expansion when needed. The average daily flow in the district is four million gallons per day (mgd), but the plant had a capacity of 1.3 mgd. In addition, the treatment plant saved the Utility District 30% to 40% on initial construction of the structure, 75% to 90% on process piping, and will help save the district up to 70% on energy costs.
机译:美国田纳西州塔兹韦尔的克莱伯恩县公用事业区在建设新的废水处理设施时节省了270万美元。长期节省未来的扩展成本,必要的工艺管道和能源成本将进一步增加可能的节约。一年前,即2004年2月,公用事业区的新Hexa-Ditch处理厂上线了。获得专利的工厂采用了通用壁设计,可以在需要时进行更便宜的扩展。该地区的平均日流量为每天四百万加仑(mgd),但该工厂的容量为1.3 mgd。此外,污水处理厂在结构的初始施工中为效用区节省了30%至40%,在工艺管道方面节省了75%至90%,并将帮助该区节省多达70%的能源成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号