首页> 外文期刊>Water & wastewater international >GHUBRA TRIAL OPERATION STARTS OMAN'S DESAL SURGE
【24h】

GHUBRA TRIAL OPERATION STARTS OMAN'S DESAL SURGE

机译:古柏拉(GHUBRA)试运转开始阿曼的热潮

获取原文
获取原文并翻译 | 示例
           

摘要

The 210,000 m~3/day new desalination plant planned in Ghubra, Oman has started trial operations with the aim to be fully commissioned by early 2016. Mohammad al-Mahuruqi, chairman of the Public Authority for Electricity & Water (PAEW) told local press that the trials would produce 50,000 m~3/day of desalinated water. It was at the end of 2012 when the independent water project (IWP) was awarded to a consortium of Japan's Sumitomo Corporation, in conjunction with Malaysia's Malakoff Corporation Berhad and Spanish firm Cadagua SA. Under a build-own-operate (BOO) project, the constructed facilities will be operated and maintained over a 20-year period, with operation slated to commence in September 2014.
机译:计划在阿曼古布拉建造的每天210,000 m〜3 / d的新海水淡化厂已开始试运营,目标是在2016年初全面投入运营。电力和水务公共管理局(PAEW)主席Mohammad al-Mahuruqi对当地媒体该试验将每天生产50,000 m〜3的淡化水。到2012年底,独立水项目(IWP)被授予日本住友公司,马来西亚马拉科夫公司Berhad和西班牙公司Cadagua SA的财团。在“自有经营”(BOO)项目下,已建成的设施将在20年的时间内运营和维护,计划于2014年9月开始运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号