首页> 外文期刊>Water & wastewater treatment >Work at Bray Gravels pumping station secures supply
【24h】

Work at Bray Gravels pumping station secures supply

机译:Bray Gravels泵站的工作可确保供应

获取原文
获取原文并翻译 | 示例
       

摘要

After more than three decades in service, the pumps at South East Water's Bray Gravels pumping station were reaching the end of their life. However, when an ROI calculation showed refurbishment was a better option than replacement, it led to a major overhaul of the water transfer pumping capability. South East Water's Bray Gravels pumping station has an essential role to play in supplying fresh water to around 300,000 homes immediately to the west of London. Built more than 30 years ago, the pumping station draws water from boreholes close to the River Thames at Maidenhead and pumps it to the Surrey Hills and Crowthome Reservoirs some 10 miles away.
机译:在使用了三十多年后,Southeast Water的Bray Gravels泵站的泵已经达到使用寿命。但是,当投资回报率计算显示翻新比更换是更好的选择时,它将导致对输水泵能力的重大检查。东南水务公司(South East Water)的布雷(Bray)砾石泵站在向伦敦西部紧邻的300,000户家庭供应淡水方面发挥着至关重要的作用。泵站建于30多年前,从Maidenhead的泰晤士河附近的钻孔中汲取水,并将其泵送到约10英里外的Surrey Hills和Crowthome水库。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号