...
首页> 外文期刊>Water Resources Management >Reliability Based Optimum Reservoir Design by Hybrid ACO-LP Algorithm
【24h】

Reliability Based Optimum Reservoir Design by Hybrid ACO-LP Algorithm

机译:基于混合ACO-LP算法的基于可靠性的最优储层设计

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Optimal design of irrigation and water supply reservoirs under reliability constraints may be categorized as large combinatorial optimization problems. In this paper, the reliability based optimum design of a single water supply reservoir is formulated as a mixed integer programming and a hybrid algorithm is introduced for its solution. To eliminate iterative procedures in reliability-based reservoir design and operation, the reliability requirements are directly embedded into the modeling framework and treated as different sets of constraints. Adaptive penalty method is used for constraint handling in the solution methodology. The proposed algorithm couples an ant colony optimization (ACO) optimizer with a virtual linear programing (LP) model for the solution of the resulted NP-hard mixed integer nonlinear programming problem. Dez reservoir for irrigation water supply with 480 months of inflow is used to demonstrate the method and its performance. The structure and solution methodology is verified by the solution to the inverse problem. It is shown that the proposed hybrid model can efficiently solve the problem for various combinations of reliability measures in a multiple period modeling scheme. It is illustrated that under some circumstances and specific reliability values, the mixed integer nonlinear programming (MINLP) solver may even fail to address a feasible and local optimal solution. Although operating rule is not included in the operational scheme, the procedure is capable of identifying coefficients for decision rules with any proposed structure.
机译:在可靠性约束下的灌溉和供水水库的优化设计可归类为大型组合优化问题。在本文中,将基于可靠性的单个供水水库的优化设计公式化为混合整数规划,并提出了一种混合算法作为其解决方案。为了消除基于可靠性的储层设计和运行中的迭代过程,将可靠性要求直接嵌入到建模框架中,并视为不同的约束集。自适应惩罚方法用于解决方案方法中的约束处理。所提出的算法将蚁群优化(ACO)优化器与虚拟线性规划(LP)模型耦合,用于解决由此产生的NP-硬混合整数非线性规划问题。使用Dez水库进行480个月的入水灌溉,证明了该方法及其性能。通过反问题的解决方案验证了结构和解决方法。结果表明,所提出的混合模型可以有效地解决多周期建模方案中可靠性度量的各种组合问题。结果表明,在某些情况下和特定的可靠性值下,混合整数非线性规划(MINLP)求解器甚至可能无法解决可行的局部最优解。尽管操作规则中未包括操作规则,但是该过程能够为具有任何建议结构的决策规则识别系数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号