...
首页> 外文期刊>Water Resources Management >Integrated Multi-Level Control Value and Variation Trend Early-Warning Approach for Deformation Safety of Arch Dam
【24h】

Integrated Multi-Level Control Value and Variation Trend Early-Warning Approach for Deformation Safety of Arch Dam

机译:综合多级控制值和变化趋势预警方法的拱坝变形安全性

获取原文
获取原文并翻译 | 示例

摘要

Appropriate early-warning index of dam deformation can be used to identify the structural behavior in real time. It is an important measures to monitor the service safety of dam engineering. This paper focuses on the approach determining the early-warning index of arch dam deformation by analyzing the prototypical observations of dam safety and implementing the numerical simulation of dam structure. First, according to the long-term deformation process of arch dam, an early-warning criterion, which combines the multi-level control value and variation trend of dam deformation, is presented. Second, the numerical analysis for structural failure is implemented to calculate the global safety factor of arch dam. A method determining the global safety factor-based control value of dam deformation is developed. Third, the multi-resolution analysis of wavelet is introduced to identify the variation trend of dam deformation from the measured data. The variation trend rule is given to judge the deformation status of arch dam. Finally, the deformation behavior of one actual arch dam is taken as an example. The multi-level control value formula of dam deformation is given. It is combined with the variation trend of dam deformation to fulfill the comprehensive evaluation of deformation safety. It is indicated that the proposed approach is suitable to be used to determine the early-warning index of arch dam deformation, can help with identifying the service safety and potential risk of dam engineering.
机译:适当的大坝变形预警指标可用于实时识别结构行为。监测大坝工程服务安全是一项重要措施。本文通过分析大坝安全性的原型观测并进行大坝结构的数值模拟,着重确定拱坝变形预警指标的方法。首先,根据拱坝的长期变形过程,提出了结合多级控制值和坝变形变化趋势的预警准则。其次,对结构破坏进行数值分析,以计算拱坝的整体安全系数。提出了一种基于全局安全系数的大坝变形控制值确定方法。第三,引入小波多分辨率分析,从实测数据中识别大坝变形的变化趋势。给出了变化趋势规律,以判断拱坝的变形状态。最后以一个实际拱坝的变形行为为例。给出了大坝变形的多级控制值公式。结合大坝变形的变化趋势,进行变形安全性的综合评价。结果表明,所提出的方法适用于确定拱坝变形预警指标,有助于识别大坝工程的服务安全和潜在风险。

著录项

  • 来源
    《Water Resources Management 》 |2017年第6期| 2025-2045| 共21页
  • 作者单位

    Hohai Univ, State Key Lab Hydrol Water Resources & Hydraul En, Nanjing 210098, Jiangsu, Peoples R China|Hohai Univ, Coll Water Conservancy & Hydropower Engn, Nanjing 210098, Jiangsu, Peoples R China;

    Hohai Univ, Coll Water Conservancy & Hydropower Engn, Nanjing 210098, Jiangsu, Peoples R China;

    Hohai Univ, Natl Engn Res Ctr Water Resources Efficient Utili, Nanjing 210098, Jiangsu, Peoples R China;

    Nanjing Inst Technol, Dept Comp Engn, Nanjing 211167, Jiangsu, Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Arch dam; Deformation safety; Early-warning index; Control value; Variation trend;

    机译:拱坝;变形安全;预警指标;控制值;变化趋势;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号