首页> 外文期刊>Water policy report >Appellate Court Rejects Industry Argument On CWA Certifications Timing
【24h】

Appellate Court Rejects Industry Argument On CWA Certifications Timing

机译:上诉法院驳回了有关CWA认证时间的行业争论

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

A key appellate court has rejected a power company suit that argued the one-year time limit in the Clean Water Act (CWA) for states to issue so-called certifications of federal water quality actions means that any additional conditions contained in the certifications must be effective within the same 12 months. The U.S. Court of Appeals for the District of Columbia Circuit ruled May 3 to reject Alcoa Power Generating Inc.'s claim that that the Federal Energy Regulatory Commission (FERC) misinterpreted the Clean Water Act (CWA) when it accepted a CWA section 401 certification from North Carolina that included provisions that delayed the effective date of the certification beyond the one-year limit. The ruling is available on InsideEPA.com. Seepage 2 for details.
机译:一家主要的上诉法院驳回了一家电力公司的诉讼,该诉讼辩称《清洁水法》(CWA)规定了为期一年的时限,要求各州发布所谓的联邦水质行为认证,这意味着认证中包含的任何附加条件必须在相同的12个月内有效。美国哥伦比亚特区巡回上诉法院于5月3日裁定驳回美铝发电公司关于联邦能源管理委员会(FERC)在接受CWA 401条认证时误解了《清洁水法》(CWA)的主张。来自北卡罗来纳州的条款,其中包括将认证的生效日期延迟超过一年的限制的条款。该裁定可在InsideEPA.com上找到。有关详细信息,请参见第2页。

著录项

  • 来源
    《Water policy report》 |2011年第10期|p.21-22|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号