首页> 外文期刊>Water policy report >Environmentalists Urge 5th Circuit To Reject EPA's Defense Of ELG Delay
【24h】

Environmentalists Urge 5th Circuit To Reject EPA's Defense Of ELG Delay

机译:环保主义者敦促第五电路拒绝EPA对ELG延误的辩护

获取原文
获取原文并翻译 | 示例
           

摘要

Environmentalists are pushing back against EPA and the power sector's defenses of the Trump administration's two-year delay of Obama-era Clean Water Act (CWA) utility wastewater guidelines, arguing that the agency's justifications for extending the rule are "post-hoc rationalization" that a federal appeals court must reject. Groups suing over the delay of the 2015 power plant effluent limitation guidelines (ELG) filed a Nov. 16 reply brief attacking EPA and the utility industry's positions in the case, and warning the U.S. Court of Appeals for the 5th Circuit that upholding the two-year delay on implementing major elements of the ELG would open the door for the agency to broadly rewrite existing rules regardless of statutory mandates. The brief is available on InsideEPA.com. (Doc. ID: 216989) Under the precedent sought by EPA and the Utility Water Act Group (UWAG) that represents power plants on CWA issues,"federal agencies would have the power to disregard mandatory statutory factors whenever an agency unilaterally determines that such factors are 'not implicated' by the rule they seek to issue," reads the environmentalists' new brief in Clean Water Action, et al., v. EPA, et al.
机译:环保主义者正在反对环保署和电力部门对特朗普政府将《奥巴马时代的清洁水法》(CWA)公用事业废水准则推迟两年的辩护,认为该机构延长该规则的理由是“事后合理化” “联邦上诉法院必须拒绝。针对2015年电厂污水排放限制指南(ELG)的延误提出诉讼的团体在11月16日提交了一份简短的回信,攻击EPA和公用事业行业在此案中的立场,并警告美国第五巡回上诉法院维持两个原则:延迟执行ELG的主要内容将为该机构敞开大门,以便无论法定要求如何,都可以广泛地重写现有规则。该简介可在InsideEPA.com上找到。 (文档ID:216989)根据EPA和代表电厂处理CWA问题的公用事业水法小组(UWAG)寻求的先例,“只要机构单方面确定联邦机构有权确定强制性法定因素,联邦机构将有权无视此类法定因素环保主义者在《清洁水行动》(Clean Water Action)等人诉美国环保署(EPA)等人的新摘要中读到,这些因素不受它们试图发布的规则的“暗示”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号