...
首页> 外文期刊>Wasserwirtschaft >Heavy Rain and Flash Floods: Implementation Aspects in the Practical Design Process
【24h】

Heavy Rain and Flash Floods: Implementation Aspects in the Practical Design Process

机译:暴雨和山洪:实用设计过程中的实施方面

获取原文
获取原文并翻译 | 示例

摘要

Flash Floods from heavy rains have caused floodings with severe damages in the last years in urban areas. The DWA-BWK guideline for practical precaution measures demonstrates explains a practical approach how damages in municipalities can be prohibited or at least minimized. Therefore the process has to be understood as a municipal common task. All stakeholders in the design process must work together, the sanitary environmental engineering discipline is only one among many other players. In this paper the importance of roads as discharge and retention elements during heavy rains and the role of the municipal planning is described by means of best practice examples.
机译:过去几年,大雨造成的山洪暴发在城市地区造成了严重破坏的洪灾。 DWA-BWK实用预防措施指南演示了一种实用方法,该方法可如何禁止或至少最小化市政损失。因此,该过程必须被理解为市政的共同任务。设计过程中的所有利益相关者必须共同努力,卫生环境工程学科只是众多参与者中的一员。在本文中,通过最佳实践示例说明了道路在大雨期间作为排水和固位要素的重要性以及市政规划的作用。

著录项

  • 来源
    《Wasserwirtschaft 》 |2015年第9期| 45-48| 共4页
  • 作者

    Piroth Klaus;

  • 作者单位

    CDM Smith Consult GmbH, Neue Bergstr 13, D-64665 Alsbach, Germany;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 ger
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号