首页> 外文期刊>Waste management & research >Supply chain analysis of e-waste processing plants in developing countries
【24h】

Supply chain analysis of e-waste processing plants in developing countries

机译:发展中国家电子废物加工厂的供应链分析

获取原文
获取原文并翻译 | 示例
       

摘要

e-Waste is generated at the staggering rate of 6.1 kg per person. In 2016, 44.7 million tonnes was generated globally, and the amount is estimated to reach 52 million tonnes annually by 2021. The management of this huge quantity of e-waste is a major problem across the world, primarily in developing countries. An effective e-waste management system is linked to the sustainability of e-waste processing plants, and currently it is plagued with different supply chain network (SCN) issues. To address the issues and challenges of SCN, there is a need to prioritize and address the constructs. The study thus combines two multiple criteria decision making (MCDM) tools, the analytical hierarchy process (AHP) and quality function deployment, to prioritize the constructs identified from literature and supported by field studies. The house of quality (HOQ) has been used for analyzing different stakeholders' requirements. The degree of importance for HOQ-1 has been derived using the AHP tool. The study revealed the most intriguing issues and challenges of e-waste processing plants considering the requirements of different stakeholders. The results showed formal collection, storage, semi-informal collection, and e-waste quality to be the major issues of processing plants. The findings obtained from MCDM analysis have been validated though two case studies in India and China. If the results obtained are applied to the existing e-waste SCN, a holistic e-waste management system can be achieved for developing countries.
机译:每人产生6.1千克的惊人电子垃圾。 2016年,全球产生了4470万吨,估计到2021年,每年的数量将达到5200万吨。管理如此大量的电子废物是全世界的主要问题,主要是在发展中国家。有效的电子废物管理系统与电子废物加工厂的可持续性息息相关,目前,它受到各种供应链网络(SCN)问题的困扰。为了解决SCN的问题和挑战,需要确定优先级并解决这些结构。因此,该研究结合了两个多标准决策(MCDM)工具,层次分析法(AHP)和质量功能部署,以优先考虑从文献中确定并得到实地研究支持的结构。质量屋(HOQ)已用于分析不同利益相关者的需求。 HOQ-1的重要程度已使用AHP工具得出。这项研究考虑到不同利益相关者的要求,揭示了电子废物加工厂最引人入胜的问题和挑战。结果表明正式收集,存储,半非正式收集和电子垃圾质量是加工厂的主要问题。通过在印度和中国进行的两个案例研究,已经验证了通过MCDM分析获得的发现。如果将获得的结果应用于现有的电子废物SCN,则可以为发展中国家实现全面的电子废物管理系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号